<< Previous post / Next post >>

08/1/2017

The Study Preparatory School - Refurbishment & External Playground Upgrade

Another summer has rolled around and just as the last, what an action-packed summer it has been. When most people are taking time off over the summer break with their families, traveling to warm, tropical beach locations, it’s a good time for school clients and contractors to get to work. Luckily for ME Construction, we get in on the sweaty action too! There’s a lot of hype and excitement around the office with landmark projects commencing in July 2017.

Within a metaphorical tennis ball’s throw from the All England Lawn Tennis Club, which hosts Wimbledon, the internationally renowned annual tennis championships, is The Study Preparatory School. ME Construction has been contracted for internal and external refurbishments, landscaping and installation works at the school’s Spencer House base, operating for years Four to Six girls.

ME Construction is decorating all the rooms and changing the carpets and lights throughout the building. The major part of the internal works is taking place on the ground floor, within the school’s existing hall. This includes demolitions and alterations to provide a new Library and Kitchen, together with external landscaping and playground facilities. Parents would also be pleased to know that ME Construction will be constructing a new parking area at the front of Spencer House. The works are being carried out while the students are away on Summer Break to minimise disruption caused by site set up, demolitions and foundations.

LEAVE A COMMENT


Send >

COMMENTS